Piling

Roger Bullivant has developed an innovative displacement solution as an alternative method to driven piling or CFA piling where minimal spoil/muckaway is required. We are building on our success with Continuous Helical Displacement (CHD) piling with our small new diameter displacement pile – CDA –...

RB Estimating Engineer Wes Bagot (pictured) was one of the first to brave the new £16.25m ICON roller coaster at Blackpool Pleasure Beach. Wes, from RB’s North West office, was involved at the start of the project and specified a precast piled foundation for the new...

Attendance at a Breakfast Club led to Roger Bullivant Limited (RB) winning a foundation contract on a flagship, urban regeneration, new village project in London. Liam Duffy, Operations Director at Developer L&Q attended a breakfast club seminar and met RB Senior Design/Estimating Engineer Nicola Carr. This...

Building Tomorrow - Delivering Foundations for the Future. An RB film made in conjunction with ITN and launched at the annual meeting of the Chartered Institute of Building. RB worked in partnership with ITN and the CIOB to celebrate advances and achievements in the construction...