Roger Bullivant has developed an innovative displacement solution as an alternative method to driven piling or CFA piling where minimal spoil/muckaway is required. We are building on our success with Continuous Helical Displacement (CHD) piling with our small new diameter displacement pile – CDA –...

Vibro stone columns are a long proven ground improvement technique. They are suitable for the improvement of soft to firm, cohesive or loose to medium dense granular natural soils or made ground. The soils are displaced and densified using a vibrating poker with the installed...

Hauling Piling Plant and Precast Piles Hauling piling plant and precast piles just got a whole lot easier for Roger Bullivant Limited (RB) with the expansion of our inhouse transport fleet.  Worlds most powerful tractor unit We've just taken delivery of our brand new Volvo FH16 750 6x4....

Roger Bullivant Limited (RB) is delivering a package of SFA restricted access piling and CFA piling at the KIA Oval in London. RB has 2 rigs on site working concurrently with a number of other demolition and construction activities. Our restricted access piling team are...

Investing in 3D printers at Derbyshire HQ, means RB can now create scaled prototypes of various products, creating a cost-effective way of trialling research & development projects. Ever the innovator, the company has already successfully produced essential 3D components for use in the precast manufacturing facility at Walton Park HQ which would...

Roger Bullivant Limited (RB) delivered the foundations for the new statue of suffragist leader Dame Millicent Fawcett in London’s Parliament Square. In late 2017, RB was commissioned to complete the foundations for the new statue. The company spent four days in January installing 9no 100mm diameter...

The final piece of track is slotted into place on the new £16.25m ICON roller coaster taking shape at Blackpool Pleasure Beach. RB delivered precast and steel piles for the foundations for the new ride, the fastest in Europe, ready for the launch of the ride...

Attendance at a Breakfast Club led to Roger Bullivant Limited (RB) winning a foundation contract on a flagship, urban regeneration, new village project in London. Liam Duffy, Operations Director at Developer L&Q attended a breakfast club seminar and met RB Senior Design/Estimating Engineer Nicola Carr. This...

RB successfully completed the ground improvement package for a wind turbine base up in the Brecon Beacons, Wales. The 66 tonne, 12001series NRG dynamic compaction rig, dropping a 10 tonne weight from up to 10m, completed 1,079 drops over 320 positions to improve the ground...

Building Tomorrow - Delivering Foundations for the Future. An RB film made in conjunction with ITN and launched at the annual meeting of the Chartered Institute of Building. RB worked in partnership with ITN and the CIOB to celebrate advances and achievements in the construction...