Roger Bullivant Limited (RB) were contracted to design and install piles for the new hi-tech visitor centre and education facility for the Battle of Britain Bunker to be constructed for Hillingdon Council. The new building is located adjacent to the existing underground bunker at RAF Uxbridge and required a combination of standard and restricted access piling to permit installation of the piles for the foundations.
Piles were required to support the new visitor centre building and external deck due to the ground conditions encountered on site and the proposed loadings.
Due to the configuration of the building two working levels were required to allow construction of the external deck at a higher level.
The original proposal for the scheme comprised 450mm diameter piles. The ground conditions consist of made ground over gravels to 6m depth, underlain by London Clay.
RB studied the ground investigation report and carried out calculations to reduce the pile diameter to 300mm and provide a more economical value engineered solution.
The pile loading requirements were 150kN compression combined with 25kN tension and 25kN horizontal loadings.
The programme for the works was crucial and due to the proposed opening date for the visitor centre the piling works needed to be completed before Christmas.